Sourcing the
"Impossible":
EOL & Hard-to-Find Parts
When components go obsolete or become scarce, we leverage our 15-year global network to find traceable originals, qualified alternatives, or redesign solutions--keeping your production on track.
Our Sourcing Network
15+ years of established relationships with authorized distributors, franchised suppliers, and verified brokers across major markets.
Authorized Distributors
Direct partnerships with Arrow, Avnet, Digi-Key, Mouser for traceable originals.
Verified Brokers
Vetted secondary market sources with full IQC inspection and X-Ray analysis.
Regional Warehouses
Strategic inventory across 6 continents for faster lead times.
Alternatives & Redesign
When original parts are unavailable, we provide two proven paths: find qualified alternatives or redesign the PCB for available components.
Component Shortage
EOL or Hard-to-Find
Find Alternatives
- Cross-reference datasheets
- Validate electrical specs
- Test prototype samples
- Confirm footprint compatibility
Redesign PCB
- DFM analysis & optimization
- Layout modification for new parts
- Fast-turn prototype (3-5 days)
- Full functional validation
Production Ready
Stable Supply Chain
Typical Turnaround
Alternative sourcing: 3-7 days for quote + sample validation. PCB redesign: 5-10 days for layout + prototype assembly. Both paths include full IQC and functional testing.
Safe Sourcing Promise
Every component--whether original or alternative--undergoes rigorous inspection before entering production.
Visual Inspection
100% visual check for package integrity, marking authenticity, and physical damage.
Electrical Testing
LCR meter validation of capacitance, resistance, and inductance values.
X-Ray Analysis
Internal die inspection for ICs to detect counterfeits and remarked parts.
Complete IQC Documentation
Every batch includes inspection reports with photos, test data, and traceability certificates. Learn more about our comprehensive incoming quality control process.
View Full IQC Process
Contact Our
Sourcing Expert
Upload your BOM and let our team analyze your component requirements. We'll provide sourcing options, pricing, and lead time estimates within 24 hours.